July 22 Update




  • Frontpage img 20140722 103942530
  • Frontpage img 20140722 103928020
  • Frontpage img 20140722 103618772
  • Frontpage img 20140722 103550896
  • Frontpage img 20140722 103537599

The heat is on, literally outside, as these dedicatated individuals finish the decks and ramps. Inside, 2 sets of lockers have been installed and molding being completed around the door. Notice the West and North decks.